Upper Zakum UZ 750 Island Surface Facilities - EPC 2

 

Client : ZADCO
Consultant : Petrofac International Ltd
Value : AED 808.7 Million
Duration : September 2014 to August 2017
Location : Upper Zakum 750 Islands - Abu Dhabi

 

The Upper Zakum Oil Field is the largest producing field in ADNOC’s portfolio. It is also the second-largest offshore oil field and the fourth-largest oil field in the world. The UZ750 project involved the construction of four artificial islands, comprising a central complex housing the processing facilities as well as the north, south and west satellite platforms.

 

SCOPE OF WORKS

  • Civil works for Central and West Islands involves settlement monitoring of critical foundations.
  • Filing and Grading, Excavation for Foundations and backfilling.
  • Road Works.
  • RCC Drain Lines for Storm Water.
  • Landscaping.
  • Demolition Works.
  • Building Package – RCC Bldgs. (CNIA & Utility Electric Substation).
  • Piling Works and related works such as Geotechnical & Structural Design of Piles.
  • Construction of SWI Structures and Outfall Structure.

 

---------------------------------------------------------

 

EPC for ASAB Full Field Development Project

 

Client : Abu Dhabi Company for Onshore Oil Operation (ADCO)
Consultant : Petrofac International Ltd
Value : AED 290 Million
Duration : September 2009 to September 2013
Location : Western Region - Abu Dhabi

 

The project is located in the western region of Abu Dhabi, and is part of the oil and gas field of ASAB.
Petrofac has awarded the contract to NBHH in 2008 for a contract duration of 44 months.
Given the location of the project, in the middle of the desert, and taking into account the requirements and constraints related to working with the oil and gas industry, the logistics became a critical aspect of the works and the strict implementation of all safety, quality and environmental procedures became a must.
Over 1000 staff from NBHH were trained to work in this environment, and were an integral part of this challenging achievement.

 

SCOPE OF WORKS

  • Construction of RCC buildings for sub stations at various locations
  • Construction of central control building with specialized finishes
  • Service buildings and gate house including all the MEP services in highly sensitive oil field area, designated as hazardous area, where the stringent control of safety and quality procedures is exercised by the client
  • Asphalt road works, gulch road as well as fixing of Kerbstone and Interlock paving
  • Installation of concrete batching plant

 

---------------------------------------------------------

 