UPGRADING OF SEWERAGE TREATMENT PLANT

Contract M35

Client : ADSSC
Consultant : KEO International
Value : AED 68.3 Million
Duration : July 2005 – July 2007
Location : Al Ain

 

THE CHALLENGE

Contract M35 targeted the upgrading of an existing sewerage treatment plant.

 

SCOPE OF WORKS

• Construction of self contained inlet headwork housing
• Fine screening facilities and vortex grit removal
• Head works lifts station, odors control system
• Replacement of 32 surface aerators with fine bubble diffused air system including two new separate blower Buildings each with 5 blowers
• Replacement of sand filter media
• Installation ok 4 km new gravity 1400 mm diameter GRP sewer
• Abandon of pumping station PS1 and old inlet
• Implementation and installation of new “SCADA” for treatment plant
• Installation of 5 km of 500 mm GRP TSE rising main
• Installation of emergency pumping system